FAQ

FAQ

No, I can remove and dispose of that for you if necessary.

The time frame will depend on the size of your home, but will generally range from between 2 to 4 days to complete.

Use a damp mop only. Avoid wet mopping of the floor which can leave excess moisture or streaking.

Yes we can replace individual boards or the entire floor if required with either new or recycled timber subject to availability to best match you existing floor.

You can save money by removing all existing floor coverings including tacks, staples and any smooth edge carpet strips from the floor.

My preferred coatings will dry overnight and be ready to accept furniture fitted with protective felt pads after 24 or 36 hours.

Floor Polishing